Hungary Combined Heat and Power Project

Hungary Combined Heat and Power Project

Description

Supplied Products: ANSI B16.9 A234 WPB elbow, reducer and B16.5 Flanges.
Country: Hungary.

Detail

This combined heat and power project is located in Tura. Geothermal company has three geothermal wells, the power generation capacity is 2.7MW, the potential geothermal resources is about 70MW, the first phase of development plans is 30MW. Turwell Company's business director Nick said all equipment, pipes, valves will be provided by the Manufacturer in China. The Manufacturer must have EC certificate and 10 years combined heat and power project experience. HengTong Pipeline supplies ANSI B16.9 A234 WPB 8-30 Inch elbow, reducer and other pipe fittings, also carbon steel ASME B16.5 flanges. And the total amount is about 1800000 USD. We are planning to deliver them in March 2017. The SGS China will perform the third inspection.